top of page

Hidalgo County
Precinct 1 Projects

Commissioner Pic .jpg

Commissioner

David Fuentes

Precinct 1 Website

Hidalgo County Precinct 1 Commissioner David Fuentes is emphasizing improvements to stormwater systems and recreational areas. Commissioner Fuentes is considering upsizing drainage pipes, expanding hike and bike trails and renovating park play structures.

Social Media

  • Facebook
  • Twitter

Delta Region Stormwater Project

The Hidalgo County Precinct 1 Delta Region Stormwater Project is a regional mitigation project that will provide flood control for the most populated areas of Hidalgo County and establish a process to reclaim the water for municipal and irrigation use.

drainage website.png

Mercedes Gate Structure Stormwater Project

The Mercedes Gate Structure Stormwater Project will reduce stormwater for the area south of Business 83 and west of S. Capisallo Road. The Mercedes Gate Structure consists of regrading approximately 4,000 L.F of ditch, adding an additional box culvert at 14th St. and adding a third outfall that consists of box culvert and gate structure that will cross under the USIBWC Levee and discharge into the USIBWC Floodway.

Image by Timothy L Brock

Inline Check Valves Stormwater Project

The Inline Check Valves Stormwater Project improvements will assist in addressing and improving the backflow for flooding problems in low-lying areas

Image by Peter Herrmann

Hike and Bike Trail

Hidalgo County Precinct 1 is planning on developing a Hike and Bike Trail in their Mid-Valley area that will pass by the Cities of Mercedes, Weslaco, Donna, Alamo, and Pharr. The Precinct 1 Hike and Bike Trail is designed to build stronger neighborhoods and communities and address social determinants of health.

PARK.jpg
bottom of page