top of page

Hidalgo County
Precinct 3 Projects

Document_documentID=43443.jpg

Commissioner

Everardo "Ever" Villarreal

Precinct 3 Website

Hidalgo County Precinct 3 Commissioner Everardo "Ever" Villarreal intends to make extensive upgrades to stormwater systems, expand hike and bike trails and renovate parks.

Social Media

  • Instagram
  • Facebook
  • Twitter

Parks

Commissioner Villarreal is in the planning stages of renovating and expanding Precinct 3 parks and recreational spaces.

oootoki.png

Educational Disparities

The Commissioner is planning the construction of a community recreational center to address educational disparities in the precinct.

rec3.png

Tierra Dorada Stormwater Project

The stormwater improvements will assist in addressing and improving stormwater infrastructure systems in Tierra Dorada, in the City of Mission, between Schuerbach Road and Moorefield Road, which often face water inequities.

image (2).png

Farm to Market Rd. 2221 (FM2221) Stormwater Project

The Hidalgo County Precinct 3 FM2221 Stormwater Project, located between Jara Chinas Road and El Pinto Road, is in need of sewer repair and subsurface drainage water due to damages caused by inclement weather.

drainage3.png

Glasscock Rd. Mile 4 to Mile 5 Stormwater Project

The stormwater improvements will assist in addressing and improving stormwater infrastructure systems to Glasscock Road in the City of Alton. The improvements will be made along Glasscock Road, just south of Mile 5 to Mile 4 (Lark Ave), which will consist of a pipe network with inlet improvements.

Fixing a Pipe
bottom of page